Lagrangian relaxation-based lower bound for the two-machine flow shop with synchronized periodic maintenance

dc.contributor.authorKrimi, Issam
dc.contributor.authorBenmaur, Rachid
dc.contributor.authorElhachemi, Nizar
dc.contributor.authorDuvivier, David
dc.date.accessioned2022-07-07T05:40:05Z
dc.date.accessioned2023-08-23T05:12:47Z
dc.date.available2022-07-07T05:40:05Z
dc.date.available2023-08-23T05:12:47Z
dc.date.issued2018-04
dc.description.abstractIn this work, we present a Lagrangian relaxation approach to generate a new lower bound for the two-machine flow shop scheduling problem under synchronized and periodic maintenance activities. The word synchronized is used to specify that the maintenance starts at the same time on both machines. The problem is denoted as F2/nr - pm/C max . First, we investigate a time-indexed formulation for the problem. Then, a lower bound was proposed using Lagrangian relaxation. Computational study shows satisfactory results.en_US
dc.identifier.citationKrimi, R. Benmansour, N. Elhachemi and D. Duvivier, "Lagrangian relaxation-based lower bound for the two-machine flow shop with synchronized periodic maintenance," 2018 4th International Conference on Optimization and Applications (ICOA), 2018, pp. 1-6,en_US
dc.identifier.doihttps://doi.org/10.1109/ICOA.2018.8370572
dc.identifier.urihttps://dspace-uat.adu.ac.ae/handle/1/3895
dc.language.isoenen_US
dc.publisherIEEEen_US
dc.subjectMaintenance engineeringen_US
dc.subjectJob shop schedulingen_US
dc.subjectLinear programmingen_US
dc.subjectSynchronizationen_US
dc.subjectTask analysisen_US
dc.titleLagrangian relaxation-based lower bound for the two-machine flow shop with synchronized periodic maintenanceen_US
dc.title.alternative2018 4th International Conference on Optimization and Applications (ICOA)en_US
dc.typeArticleen_US

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: