Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation

dc.contributor.authorBahou, Ziyad
dc.contributor.authorLemnaouar, Mohamed Reda
dc.contributor.authorKrimi, Issam
dc.date.accessioned2024-07-30T11:27:29Z
dc.date.available2024-07-30T11:27:29Z
dc.date.issued2024-01
dc.description.abstractIntegrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a two-stage solution for the integrated PM scheduling and production planning problem within multi-parallel component manufacturing systems, accounting for diverse interdependencies. These interdependencies encompass stochastic, structural, economic, and resource-related interdependencies, all while accounting for the resultant degradation. The primary objective is jointly optimizing costs associated with holding, backorders, production, setup, and maintenance. Initially, we employ an Ordinary Differential System to compute a realistic production capacity. Additionally, we analyze the effects of interdependence-induced degradation on system availability and failures. Subsequently, we formulate the problem as an integer programming model to determine an optimal joint plan. The effectiveness of our approach is validated through numerical examples and sensitivity analysis, providing insightful guidance for efficient PM scheduling and production planning, particularly in large-scale production systems. Keywords: Integer programming, Interdependencies-induced degradation, Ordinary differential system, Preventive maintenance scheduling, Production planning
dc.identifier.citationBahou, Z., Lemnaouar, M. R., & Krimi, I. (2024). Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation. The International Journal of Advanced Manufacturing Technology, 130(9), 4723-4749.
dc.identifier.doihttps://doi.org/10.1007/s00170-024-12975-4
dc.identifier.urihttps://repository.adu.ac.ae/handle/1/6088
dc.language.isoen
dc.publisherSpringer Link
dc.titleIntegrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation
dc.typeArticle

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: