Design procedures and field monitoring of submerged barbs for streambank protection

dc.contributor.authorPapanicolaou, A.N.
dc.contributor.authorElhakeem, Mohamed
dc.date.accessioned2022-03-28T05:28:29Z
dc.date.accessioned2023-08-19T08:11:20Z
dc.date.available2022-03-28T05:28:29Z
dc.date.available2023-08-19T08:11:20Z
dc.date.issued2007-06
dc.description.abstractThe main objective of this study was to evaluate the hydraulic performance of riprap spurs and weirs in controlling bank erosion at the Southern part of the Raccoon River upstream U.S. Highway 169 Bridge utilizing the commercially available model FESWMS and field monitoring. It was found based on a 2 year monitoring and numerical modeling that the design of structures was overall successful, including their spacing and stability. The riprap material incorporated into the structures was directly and favorably correlated to the flow transmission through the structure, or in other words, dictated the permeable nature of the structure. It was found that the permeable dikes and weirs chosen in this study created less volume of scour in the vicinity of the structure toes and thus have less risk comparatively to other impermeable structures to collapse. The fact that the structures permitted the transmission of flow through them it allowed fine sand particles to fill in the gaps of the rock interstices and thus cement and better stabilize the structures. During bank-full flows the maximum scour hole was recorded away from the structures toe and the scourhole size was directly related to the protrusion angle of the structure to the flow. It was concluded that the proposed structure inclination with respect to the main flow direction was appropriate since it provides maximum bank protection while creating the largest volume of local scour away from the structure and towards the center of the channel. Furthermore, the lowest potential for bank erosion also occurs with the present set-up design chosen by the IDOT. About 2 ft of new material was deposited in the area located between the structures for the period extending from the construction day to May 2007. Surveys obtained by sonar and the presence of vegetation indicate that new material has been added at the bank toes. Finally, the structures provided higher variability in bed topography forming resting pools, creating flow shade on the leeward side of the structure, and separation of bed substrate due to different flow conditions. Another notable environmental benefit to rock riprap weirs and dikes is the creation of resting pools, especially in year 2007 (2nd year of the project). The magnitude of these benefits to aquatic habitat has been found in the literature that is directly related to the induced scour-hole volume.en_US
dc.identifier.citationPapanicolaou, A. N., & Elhakeem, M. (2007). Design procedures and field monitoring of submerged barbs for streambank protection (No. IHRB Project TR-534).en_US
dc.identifier.doihttps://rosap.ntl.bts.gov/view/dot/23456/dot_23456_DS1.pdfen
dc.identifier.urihttps://edms.wexl.in/handle/1/3020
dc.language.isoenen_US
dc.publisherState Library of IOWAen_US
dc.subjectBarbs designen_US
dc.subjectErosion controlen_US
dc.subjectHydrodynamic modelsen_US
dc.subjectTR-534en_US
dc.titleDesign procedures and field monitoring of submerged barbs for streambank protectionen_US
dc.title.alternativeJournal articleen_US
dc.typeReporten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Design procedures and field monitoring of submerged barbs for streambank protection.pdf
Size:
1.86 MB
Format:
Adobe Portable Document Format
Description:
Design procedures and field monitoring of submerged barbs for streambank protection

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: