Incorporating time standards into generative CAPP: a construction steel case study

dc.contributor.authorAl-Aomar, Raid
dc.contributor.authorBashar El‐Khasawneh
dc.contributor.authorSinan Obaidat
dc.date.accessioned2018-04-05T11:56:33Z
dc.date.accessioned2023-08-19T07:59:28Z
dc.date.available2018-04-05T11:56:33Z
dc.date.available2023-08-19T07:59:28Z
dc.date.issued2012
dc.descriptionRaid Al‐Aomar, Bashar El‐Khasawneh, Sinan Obaidat, (2012) "Incorporating time standards into generative CAPP: a construction steel case study", Journal of Manufacturing Technology Management, Vol. 24 Issue: 1, pp.95-112
dc.description.abstractPurpose – Time standards are essential to plan and analyze manufacturing processes. A key element of process planning that is not generated from a typical computer‐aided process plan (CAPP) is the process time standards. Generative process planning that includes time standards is particularly needed in the construction steel building (CSB) industry due to variability in projects (orders) size and content. Hence, the purpose of this paper is to focus on incorporating time standards into CAPP of CSB. Design/methodology/approach – Empirical formulas are developed to generate time standards for variant steel beams based on their CAD files (design parameters and geometry) and process parameters (operational conditions). A Motion and Time Study (MTS) is used to estimate times for manual work elements such as load/unload activities and to validate the generated time standards. A generic parametric model is developed with Excel and integrated into the CAPP system to automatically estimate the standard time of each process operation. Findings – Results showed that developing the time standards module for process operations and integrating its spreadsheets into a generative CAPP has helped process planners to arrive at better estimates of process parameters and has helped production management and the overall project management process in CSB industry. Practical implications – The application of the proposed approach is not limited to CSB industry but it can also contribute to the continuing growth of CAPP applications in other industries. Originality/value – The study is unique since it incorporates time standards into the architecture of CAPP system for accurate time and cost estimation and effective resource allocation and project management and it utilizes motion and time study (MTS) to collect complementary process data and validate the model‐generated cycle times.en_US
dc.identifier.citationAl‐Aomar, R., El‐Khasawneh, B., & Obaidat, S. (2012). Incorporating time standards into generative CAPP: a construction steel case study. Journal of Manufacturing Technology Management, 24(1), 95-112.en_US
dc.identifier.doihttps://doi.org/10.1108/17410381311287508
dc.identifier.urihttps://edms.wexl.in/handle/1/1076
dc.language.isoen_USen_US
dc.publisherEmerald Group Publishing Limiteden_US
dc.subjectConstruction Industry, Generative Process Planning,Steel Beam Fabrication,Manufacturing Process Optimizationen_US
dc.titleIncorporating time standards into generative CAPP: a construction steel case studyen_US
dc.typeArticleen_US

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: