The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study

dc.contributor.authorKrimi, Issam
dc.contributor.authorBenmansour, Rachid
dc.contributor.authorCadi, Abdessamad Ait el
dc.contributor.authorDuvivier, David
dc.contributor.authorElhachemi, Nizar
dc.contributor.authorETAL.
dc.date.accessioned2022-07-06T06:45:47Z
dc.date.accessioned2023-08-23T05:12:45Z
dc.date.available2022-07-06T06:45:47Z
dc.date.available2023-08-23T05:12:45Z
dc.date.issued2018
dc.description.abstractIn the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods restriction is not imposed. In this work, we were interested by the BACAP under availability and high tide time windows restrictions in bulk port terminal. We proposed a mixed integer programming model for the problem and then, validated it by studying the real-case of Jorf lasfar Phosphate Hub (JPH). Preliminary computational experiments show some promising research opportunities.en_US
dc.identifier.citationI. Krimi et al., "The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study," 2018 7th International Conference on Industrial Technology and Management (ICITM), 2018, pp. 157-161,en_US
dc.identifier.doihttps://doi.org/10.1109/ICITM.2018.8333938
dc.identifier.urihttps://dspace-uat.adu.ac.ae/handle/1/3884
dc.language.isoenen_US
dc.publisherIEEEen_US
dc.subjectResource managementen_US
dc.subjectCranesen_US
dc.subjectTidesen_US
dc.subjectHeuristic algorithmsen_US
dc.subjectLinear programmingen_US
dc.titleThe integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case studyen_US
dc.title.alternativeRAIRO-Operations Researchen_US
dc.typeArticleen_US

Files

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Plain Text
Description: