Spreadsheet Optimization of Flow for WIP Goods at a Yarn and Tire Cord Manufacturer: A Case Study
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
5th International Symposium on Intelligent Manufacturing Systems, Sakarya, Turkey.
DOI
Abstract
We developed a spreadsheet optimization model to find the optimal material handling policy at a leading yarn and tire cord manufacturer’s facility. The focus of the study is to optimize the movement of looms of yarn and tire cord between two
major manufacturing steps. The considere d flow network within the manufacturing facility is a miniature two-stage supply chain, including the middlelayer of depots. Movement of material takes place through forklift trucks and cranes, which impose electricity, labor, maintenance, and depreciation costs. After introducing the company, the facility, and the project goals, we present the
underlying linear programming (LP) model and our spreadsheet implementation. The results of our model suggest an annual saving of approximately $22,000 for the facility. Submission areas: Manufacturing Systems Engineering.
Keywords
Citation
Mataraci, B., & Ertek, G. (2006). Spreadsheet optimization of flow for WIP goods at a yarn and tire cord manufacturer: a case study.
